Your comprehensive rooftop solar design software for EPCs in India. Streamline electrical design, structural layout (compatible with PM Surya Ghar scheme guidelines), and BOM generation.
Step 1: Electrical Design
Solar Panel Configuration
Total Panel DC kWp: 0.00 kWp
Inverter Configuration
Total Inverter AC kW: 0.00 kW
Electrical Design Errors:
Electrical Design Results (per Inverter)
Total Inverters:
Panels Per Inverter:
Panel Voc at -10°C (Assumed): V
Panel Vmp at 75°C (Assumed): V
Min Panels/String:
Max Panels/String:
Suggested Panels/String:
System Optimization (DC/AC Ratio):
0%
Stringing Configuration (for one inverter):
No valid stringing configuration found.
System Single Line Diagram (SLD):
Conceptual Panel Layout (per Inverter):
Considerations for Electrical Balance of Material (BOM)
Selected BOM
Disclaimer: Electrical calculations are simplified. Min/Max operating temperatures are assumed. Default DC overloading is assumed. Actual design requires detailed engineering. Diagrams are conceptual.
Electrical Design Suggestions/Notes:
Step 2: Structural Design
Summary from Electrical Design:
Selected Solar Panel:N/A
Total Panels to Layout for Structure:N/A
Selected Inverter:N/A
Number of Inverters:N/A
Map Solar Panel Layout on Canvas
Initializing layout...
{/* Canvas rows will be injected here by JavaScript */}
South
Overall Structure Parameters
Note: Inter-panel horizontal and vertical spacings within each 2-deep table are fixed at 0.05 ft (approx 15mm) for calculations in this tool.
Structural Design Errors:
Structural Design Suggestions/Notes:
Structural Design Results
Reference Panel Information:
Top-Down View (Conceptual)
Side View (Typical Bay)
Structural Bill of Materials (BOM)
Component
Material & Profile
L/Pc (ft)
Qty
Total L (ft)
Unit Wt.
Total Wt. (kg)
Total Structure Wt.
- kg
Total Dead Load (Panels + Structure)
- kg
Note: All structural weights are estimates. Actual values may vary. Professional engineering validation is required. Diagrams are conceptual.